INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Conveyor line Assignment Simulation(Linear Program)

Conveyor line Assignment Simulation(Linear Program)

Conveyor line Assignment Simulation(Linear Program)

(OP)
I am working on a linear program to optimise the assignment of tools to a conveyor line with only 88 carraiges. My objective is to keep the workload of loading operators balanced with every pass of the line which has a 10 min cycle.

I would appreciate model algorithms that would help define this assignment procedures or guide me with thru the process. Any suggestions?
Much oblidged

RE: Conveyor line Assignment Simulation(Linear Program)

Kutting Edge.....first things first.....it's been a while since I've done any Linear Programming, but I know the first step is to determine your X's(decision variables) and Y(objective Function). After your decision variables and objective function have been established it is time to set-up some conditions (constraints) that have to satisfied.

Here's a few suggestions you might want to consider before attacking this problem.

1.Seems to me that a balanced work load is more of a constraint than an objective.  Maybe the Objective should be to Minimize the work load thus, Labor cost(Z= Min Labor Cost)....period.....it's possible to have a balanced work load that is cost prohibitive. I assume the 10 Min cycle time is based on your current demand and is subject to change based on future demand.


2. You can define your model such that the work load (X1) is always balanced....so you could have a constraint equation that would state in effect(would have to set-up 5 or 6 conditions realistically) that the cycle time for a workstation  = total standard cycle time for a product/10 min cycle time....and because your objective function states that you want to minimize the work load (well, the labor cost)....it will balance it based on a minimal number of operators. Seldomly is any job 100% efficient(perfectly balanced), so you will have to include an efficiency that you can live w/.

3. Without knowing more about the relationship of the tools to the conveyor line. It seems like the constraints for tool allocation (X2) will be established based upon what has to be done to min. and balance X1...certainly there are other other constraints based upon mfg. requirements etc. but to some extent minimizing X1 will probably depend on how you allocate the tools.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources