INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Should this system be TSSA certified? Piping system

Should this system be TSSA certified? Piping system

Should this system be TSSA certified? Piping system

(OP)
Hello,

Here is the system in question:

a heat recovery system for heating other areas

System specifications:
Design temp : 25-40C
Design Pressure : 90-100 PSI
Fluid: 50% H2O 50% Propylene Glycol
It has been checked out by a PEng. and stamped, and analyzed with ALGOR, using ASME Boiler & Pressure Vessel standards.

Thanks

RE: Should this system be TSSA certified? Piping system

Echan - most people on this site won't have any idea what the TSSA is. For anyone who doesn't know, and is interested, it's the Technical Standards & Safety Authority and is the inspection authority for boilers & pressure vessels, pressure piping, and fuel safety (among other things) in Ontario.

What's the heat source? If it has anything to do with fuel fired equipment, the installation may very well involve the Fuel Safety people. If the relief valves are set beyond a given threshold, then it could involve the Boilers & Pressure Vessels group. If you have any doubts, contact the TSSA directly www.tssa.org and get the official word right from the source.

The bulk of my work involves pressure piping, and simply having an design stamped by a PE does NOT constitute registration in Ontario. A huge number of people - including many PE's - mistakenly believe that it does. The TSSA must approve & stamp the design & specification, inspect the competed installation, and witness the hydrostatic test. Until that process is completed, the installation does not meet code requirements in Ontario.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources