INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Removing shoring from a reinforced concrete slab

Removing shoring from a reinforced concrete slab

Removing shoring from a reinforced concrete slab

(OP)
When is it generally appropriate to remove shoring from reinforced concrete construction.  The case I am specifically asking about is a one-way slab supported by reinforced concrete walls.  The 7 day breaks have returned at a little over 3,200 psi of 4,000 psi specified at 28 days.

Is there a rule of thumb to go by?

RE: Removing shoring from a reinforced concrete slab

The South Carolina DOT allows falsework for elevated slabs (typically bridge decks that can be similar to your description) to be removed when test cylinder compressive strength is 75% of design strength. No superimposed loads are allowed on the slab until 90% of design strength. However the specification requires the test cylinders to be cured under the same conditions as the structure (not in the optimum conditions of the testing lab).

This requirement has a long, successful history.

RE: Removing shoring from a reinforced concrete slab

Did you design the slab?  If you did, how much of the design load was self-weight, and how much was due to live loads?

I suspect that you're okay as long as you don't allow any imposed loads on it.  But this is a call that the slab's designer should make -



Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora.  See FAQ158-922 for recommendations regarding the question, "How Do You Evaluate Fill Settlement Beneath Structures?"

RE: Removing shoring from a reinforced concrete slab

I agree with the first two replies.  I wouldn't load it with significant live load until the 28 day breaks come in OK.

RE: Removing shoring from a reinforced concrete slab

As a rule of thumb (depending on the mix design), false work for a soffit or walls supporting vert. load should not be removed until the concrete has reached 90% design strength (14-20 days), walls not supporting vert. load can be stripped at 70% design strength (usually around 6-9 days).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.