INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Connection design LRFD or ASD?

Connection design LRFD or ASD?

Connection design LRFD or ASD?

(OP)
What is everyone using for seismic connection design?  The new provions have an ASD section our people using this or using the ASD?  Thanks.

RE: Connection design LRFD or ASD?

What do your clients or local governing authority require?

I prefer ASD.  Why do extra calculations for (ultimately) the same answer.  The main argument from my perspective was to save steel for large commercial projects that utilized similar size beams, configurations etc.  I have seen savings measured in trade publications, especially by those promoting LRFD, as 1. to 3. percent.  For very large commercial projects that may be justified savings.  My clientele are mostly heavy industrial.  We take into account additional effects of corrosive environments that those in the commercial arena do not have to account for.  Sometimes, as in pulp and paper mills, the rule is Big by Heavy.

RE: Connection design LRFD or ASD?

we require the fabricator to submit LRFD calculations using the uniform force distribution method in the LRFD manual. we allow them to design all standard shear connx in asd

RE: Connection design LRFD or ASD?

Tecnically, the seismic loads are "LRFD" so if you want to be correct you should be doing your connection design in LRFD.  

Typically, most connection design is ASD.  The Seismic forces are"factored" down to alloawble loads and the design is based on those values.  

I have designed the connections for several projects for different fabricators where the EOR specified the connection designed for 80% of the tension load of the HSS brace for example.  So the ASD or LRFD value could be used.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources