INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

What is well kill operation?

What is well kill operation?

What is well kill operation?

(OP)
Hi guys,

The platform that we are currently working on has 6 slots of wellhead. 5 for the well fluids and the remaining one is for the well kill operations.

What is it (well kill operations)? and how does it works?

Resizal

RE: What is well kill operation?

Im not a petroleum engineer but this is my understanding of how it works:

You add a fluid/mud down the well. The desity of the fluid has been adjusted in advance so that the weight of the liquid collumn outbalance the pressure down hole.

I dont know if plugging the well with concrete or whatever is a part of it too.

If you work on a platform why dont you just ask around?

Best regards

Morten

RE: What is well kill operation?

(OP)
Hi MortenA,

Thanks for the info. Actually I am not working on the platform. We are engaged in a platform design project at this moment of time. So this is my very first time to encounter such term.

TQ.

RE: What is well kill operation?

but seriously - if you need to know details of this there must be somebody you can ask?

Anyway my description is correct in general terms. Im not very much aware of how its done with regards to operation details such as how to adjust the desity of the mud - but i think adding barium in varying amounths is used.

Best regards

Morten

RE: What is well kill operation?

MortenA is generally correct.  Barite is used to increase solution densities as required.  In addition the solvent used may not be water only.  I believe you reach a limit of about 16-17 pounds per gallon with water based muds.  I have seen oil based muds that run upwards of 20 pounds per gallon.  The heavy solutions can be used to "kill" a well if during operations the platform were to "take a kick".  Ultimately the goal is to maintain control of the well.  If hydrocarbons were allowed to vent at the surface (otherwise know as a blow out) there is a hugh chance of fire/explosion.  If you were working on that platform, that would a very bad thing. As for plugging the well with cement that would not be of benefit.  Cement solutions run 15-16 pounds per gallon and require typically 8 hours to cure and provide any appreciable strength. More over during this time natural gas can and will channel it's way to the surface.  Also, it cost someone in excess of millions to drill that hole.  Why would the plug it if they didn't have to?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources