INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Excavated dirt & mud temporary storage challenge!!!

Excavated dirt & mud temporary storage challenge!!!

Excavated dirt & mud temporary storage challenge!!!

(OP)
The majority of the dirt moving is from vacuum excavations to provide trenches for new underground water piping. We do not have enough environmental permitted land on this military base to dump our dirt. I am looking for an alternate solution to temporarily store the mud & dirt. Looking for any possible solution A.S.A.P. Thank you!

RE: Excavated dirt & mud temporary storage challenge!!!

you could raise the height of your piles by using retaining walls, maybe reinforced earth or temporary method to stabilize and increase the allowable slope

RE: Excavated dirt & mud temporary storage challenge!!!

(OP)
Your prompt response is very kind. Can you please be a little more descriptive about set up to handle large capacity of mud & dirt from our vacuum excavation. Thank you.

RE: Excavated dirt & mud temporary storage challenge!!!

i assume you are estimating the storage volume of your site based on an assumed angle of repose for the material and a maximum height for the piles.  you could increase the steepness of the slope by using retaining walls of some sort or maybe by using a geogrid to reinforce the embankment.  you would need to consult with a geotech to design the system.

RE: Excavated dirt & mud temporary storage challenge!!!

You can mix the dirt with cement. There is mixing equipment that can be attached  to a hydraulic excavator. With quantitie of cement around 150 kg per m3 you obtain a material that can be used as backfill

RE: Excavated dirt & mud temporary storage challenge!!!

How wide are your trenches? Can you reduce the width? Have you considered installation by directional drilling? Good idea from Big Harvey put the excavated material back - what's wrong with it in its excavated state.

cvg think you've read the post incorrectly!

Zambo

RE: Excavated dirt & mud temporary storage challenge!!!

I assume that a part of the problem is the wet condition of the spoils.  Have you thought about "reclaiming" the spoils much like is done with dredging operations?  Some sort of dewatering seems to be needed.

cvg's post wasn't far afield; dewatered spoils could be put into large piles temporarily - or the spoils placed and dewatered by gravity (with help, of course.)  To me, the big question is why the excavated quantities are larger than were expected (hence the permitted land area wasn't big enough)...

Perhaps we are dealing with a symptom, not the real problem.



Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora.

RE: Excavated dirt & mud temporary storage challenge!!!

(OP)
The contractors did not expect the amound of mud collected from vacuum excavation. The original plan was to hand-dig but since vacuum excavation was introduced to the recently. We do not have any permitted land to dump our mud because environmental people are afraid that it will run to the nearby creek, this is a symptom that we are dealing with.

However, if any of you can think of any possible solution that won't involve cost, I certainly appreciate that, otherwise, thank you so much for everyone's time.

RE: Excavated dirt & mud temporary storage challenge!!!

Hmmm,

"There's no such thing as a free lunch."  

My first suggestion is that you talk to your base CE (unless that's you, of course!) to see if s/he has any ideas.  Then you might contact any friends you have with COE, particularly the folks at WES in Vicksburg.  Those are all resources that are available to you (assuming we are discussing a U.S. base, of course.)

Do you have any other real estate that could be used temporarily?  

You could also create a dike around your dewatering area to protect against contamination of the creek - allowing you to increase the storage depth.



Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora.

RE: Excavated dirt & mud temporary storage challenge!!!

(OP)
Fotch,

Thank you so much for your concern. You are exactly right. We already found the solution: we will have a small area to dump mud, we will create a pit that will handle certain volume, and we will empty every other 2-3 days to off-base landfill.

Again, thank you so much for people who are concerned about other people.

RE: Excavated dirt & mud temporary storage challenge!!!

Hmm... I read cvg's post wrong. Where he said piles I would say heaps. When he said piles I thought about piers! Strange.. apologies.

Zambo

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources