INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASTM A 420 / A 420M - WPL6

ASTM A 420 / A 420M - WPL6

ASTM A 420 / A 420M - WPL6

(OP)
If cold-forming fittings to this specification what heat treatment is required after forming. Is stress relieving enough or do the formed fittings have to be normalised?

RE: ASTM A 420 / A 420M - WPL6

According to specification ASTM A 420, fittings that are welded must be post weld heat treated in accordance with Table 3, otherwise the fittings must be supplied in a normalized, normalized and tempered, annealed, or quenched and tempered condition.

If the fittings are cold-formed, I would recommend a stress relief following the guidelines of Table 3 for post weld heat treatment.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources