Smart questions
Smart answers
Smart people
Join Eng-Tips Forums
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Member Login




Remember Me
Forgot Password?
Join Us!

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips now!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

Join Eng-Tips
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.
Jobs from Indeed

Link To This Forum!

Partner Button
Add Stickiness To Your Site By Linking To This Professionally Managed Technical Forum.
Just copy and paste the
code below into your site.

panteo (Chemical) (OP)
20 Jan 04 0:12
Hope someone could provide me some advice on this.
I'm working at a large chemical complex in Korea.
Our 27years old firewater system consists of two main pumps, motor driven/engine driven and small jockey pump with total of 3miles underground waterpipe(Pipe dia: 8inch). Our firewater pressure is kept at 10BAR. But the firewater piping is very leaky and the amount of water loss is some 50tons per hour.
To save the water loss, we plan to replace the loops.
The disputed topic is whether the piping installed at above ground or at underground.
Mechanical engineer is opt for above ground installation because of easy maintenance. But I think the pipelines at the above ground can be damaged by strong flame in the event of severe fire or explosion.

Many thanks in advance
kjbsze (Chemical)
15 Mar 04 12:31
Very expensive to keep above grade firewater piping from freezing. For existing facility, the pipe rack may not be able to support the added weight of pipe. Since you mention excessive leaking, I assume you have a wet system.
TravisMack (Mechanical)
15 Mar 04 17:41
From an installation standpoint, there are many variables that will affect the cost.  However, you described an existing chemical facility.  I can envision a nightmare trying to route a new 8" supply loop overhead through the facility.  The installation costs will likely be quite a bit higher to run overhead.  True, maintenance is easier, but if you use sectional valves wisely in the underground, the maintenance costs can be reduced.

I would not worry about a large fire damaging the pipe.  If the fire gets that bad, the building is going as well.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close