INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Lift Station Float Elevations

Lift Station Float Elevations

Lift Station Float Elevations

(OP)
I am working on a Master Lift Station design and wish to know if there are minimum design standards for the lift station float elevations - alarm on, lag pump, lead pump, pumps off, etc.  Can anyone recommend a design reference also.  Thanks in advance for the information.

RE: Lift Station Float Elevations

The cut out float should be set a distance above the floor in accordance with the minimum pump submergence provided by the pump supplier.

The lead pump should be set above cut out to give an active volume so you don't exceed your pump starts.

The lag pump (depending on your philosophy) can be set a minimum of 150mm above the lead start (so long as this gives the lead pump time to ramp up before it triggers the lag pump unnecessarily).

I have assumed your PS is not under variable speed control. Mail me back if you need more help.

Cheers
Aussie Mike

RE: Lift Station Float Elevations

For smaller lift stations.

I set the stop float at an elevation above the pumps as recommended by the pump manufacturer.  They will want a minimum submergence.

The lead start float should provide a minimum volume as dictated by the following equation.

    Vmin = Tmin X Q / 4

The Tmin is 6 minutes which is the cycle time.  It provides for 10 starts per hour.

Q is the pump capacity in GPM.

I don't know of any hard fast rule for the lag pump volume.  I typically use approximately 50% of the Vmin.

I typically then place the alarm float 3"-6" above the lag pump on which should be at or about the lowest inlet flowline.

RE: Lift Station Float Elevations

(OP)
Thank you both for the valuable information.  This lift station will actually be a Master Lift Station, with peak flows of about 1100 gpm.  Your input is appreciated.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources