INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

(OP)
Analyzer Building, project what I started a some time ago, provides better ventilation system and reduction of classified area from Division 2 Group B to Division 2 Group D. Building is very old with some existing equipment as "general purpose equipment" ( lighting, fans) i.e. with unclassified equipment inside hazardous classified zone.
I have to STAMP this project as P.Eng. but I am refusing.
Please your comments

RE: GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

How does ventilation change the group of the product involved?  The group is based on the physical properties of the product.  In general the code permits non-arc producing equipment that has a normal operating temperature of 80% or less than the ignition temperature of the product involved to be in NEMA 1 enclosures in Class 1 Division 2 areas.
Don

RE: GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

I agree with the previous post.  The classification change when we ventilate according to NFPA 820 would change area rating from Class 1, Div 1 to Class 1, Div 2 or Class1/Div2 to unclassified (the ventilation rates and monitoring requirements vary with type of space).  Many instruments and analysers are available from various suppliers as rated for installation in classified space (no ventilation required) but this also varies with manufacturer.  Information on type/rate of ventilation and monitoring (NFPA requires status to be monitored to make sure that ventilation is in operation to meet ratings) is required to better understand your situation.

Moeszu.

RE: GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

I know, many analyzer building bring in hydrogen for gas chromatographs and the building has lights and heaters not rated for group B. I would have thought forced ventilation, hydrocarbon (calibrated for hydrogen) detector and excess flow check valve on hydrogen line woulkd suffice. Many analyzer buildings have analyzer enclosures with bolts missing. I would think a proactive approch is the best solutio

RE: GENERAL PURPOSE EQUIPMENT INSIDE HAZARDOUS ZONE

Maybe you're just ventillating the hydrogen, and that's how you're going from D2B to D2D?

Anyway, I think that's besides the point.  You can't put GP lighting fixtures in there, they're not T-rated, there's no guarantee that their surface temperature will not exceed the ignition temperature.  That's a no-no in Div 2.

GP fans may be OK -- BUT -- you need to make sure that there are no arcing devices inside the fans.  If you have integral overloads in the motors, you'll need to pull them, relocate them to a GP area, and replace them with solid jumpers.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.