INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Jib Crane

Jib Crane

Jib Crane

(OP)
I'm looking for a 'generic' solution for a jib crane support.  The actual jib crane has a maximum reach of about 20' and a maximum service load of 2000 pounds.  The existing concrete floor slab is sawcut away, a small pit is excavated and a 'blob' foundation is cast into the void.  The top of the foundation is cast flush with the top of the slab and the jib crane bolted to the foundation.  Soil is generally dense, non-cohesive.  I've designed a few of these, but an wondering if there's a generic solution out there (nice to have a reference).

The gravity loads are resisted by the soil and the overturning is resisted by the soil at the base, active soil pressure on one side and the concrete slab at the top on the opposite side.  The effects of any soil friction on the sides has been neglected, but the generic solution could include this (although I wouldn't include this component in the final design).

Can anyone suggest a website, spreadsheet or a text that has a generic solution for this?

RE: Jib Crane

I would do the stability calculation in a spreadsheet of my own, as normal structural analysis software does not always have the load and stability factors in the right places.

Then use foundation design software for the footing, and structural steel design for the steel part.

RE: Jib Crane

(OP)
RiBeneke:
Can you outline the stability calcs a bit.  For overall stability, I assume the bearing value as uniform at the outside edge and neglect the effect of the active soil and slab.  For pressure distribution, I assume a regular triangular distribution going from 0 to max bearing, the full width of the footing and a triangular load active soil pressure on one side and a point load balancing this on the opposite side generated by the slab.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources