INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Slug Catcher areas of sludge build up

Slug Catcher areas of sludge build up

Slug Catcher areas of sludge build up

(OP)
In addition to my previous post. Other than in the base of the slugcatcher, has anyone experienced significant build up in other sections? separation section, intermediate section or receiving section fingers.

Thanks
Ian

RE: Slug Catcher areas of sludge build up

scanguy,
zdas04 gave you a quite comprehensive answer in the previous thread.Your question is however difficult to answer as this is related to several disciplines as per the list hereafter which is not exhaustive:
1) type of reservoir and reservoir matrix , type of well completion and sand packings (if any for loose sand reservoirs);
2) type of produced fluids -gas,condensate,oil,waters and their physical properties (dedensity,viscosity,etc)and composition,solids entained,flow rates,etc
3)reservoir simulation jobs,acid or fracture jobs to improve reservoir permeability;
4)stage of reservoir production when pipeline pigging is done- start up,maturity,etc as the reservoir fluid composition will change and quantity of entrained solids will increase ,
5) corrosivity of the process fluids, level of the upstream separation if any,state of the pipeline;type of pigging,etc
6)the most important,the design of your slug catcher (capacity of each section for a proper separation and then accumulation ) vs. all above points and vs.the liquid/solid volums expected.
So you may have to get an answer from each concerned Specialist for all above points and as such the informations you are looking for.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources