INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PRECAST CONCRETE PILE

PRECAST CONCRETE PILE

PRECAST CONCRETE PILE

(OP)
WHAT IS A GOOD SLUMP REQUIREMENT FOR PRECAST CONCRETE PILE?
WHAT IS A GOO SIDE CLEARANCE FOR POURING?
IS ROTATION OK FOR AURGER PILES NOT GOOD DURING PUMPING?

RE: PRECAST CONCRETE PILE

Slump:
Depends on required strength and the batch mix (w/ or w/o admixtures)

Concrete Cover (manufactured under plant control conditions):
Exposed to Earth => #6 bar (.75" diam.) to #11 bar (1.41" diam.) requires 1.5" cover
#5 bar (.625" diam) and smaller requires 1.25" cover

Auger Piles:  not clear as to what you are asking.

RE: PRECAST CONCRETE PILE

(OP)
it is mix with 4000 psi w/ admixtures
cover 2 1/2" w/ #6 bars 50 ton Capacity

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources