Underground Cables Installed but Left Denergized
Underground Cables Installed but Left Denergized
(OP)
Our construction people want to install 15kV feeders underground, direct buried and leave them for approximately 9 months untill the equipment arrives. The cables consist of corrgated aluminum armor with an outer PVC jacket. The cables would be stubbed out at both ends and sealed. They will be buried about 1500mm deep in a fine sand bed. By doing this the constructors will complete the civil work sooner. Anyone ever heard of any problems in doing this.






RE: Underground Cables Installed but Left Denergized
A perfect application for capped duct banks and pulling line.
RE: Underground Cables Installed but Left Denergized
RE: Underground Cables Installed but Left Denergized
RE: Underground Cables Installed but Left Denergized