Floating System/UPS
Floating System/UPS
(OP)
We are currently on an offshore production unit and we have a concern that the UPS transformer secondary has not got the neutral line bonded to earth.
Primary is 415 Volts 3 phase and Secondary is 240 volts 1 phase.
Primary is 415 Volts 3 phase and Secondary is 240 volts 1 phase.






RE: Floating System/UPS
RE: Floating System/UPS
RE: Floating System/UPS
RE: Floating System/UPS