Can someone provide the formula for calculating the sawing time by using a horizontal band saw machine?
To saw the following materials:
Example 1:
-Solid 8" bar
-4140 steel
Example 2:
-Tube with 8"OD x 5" ID
-4140 steel
Thank you.
-V
Can someone provide the formula for calculating the sawing time by using a horizontal band saw machine?
To saw the following materials:
Example 1:
-Solid 8" bar
-4140 steel
Example 2:
-Tube with 8"OD x 5" ID
-4140 steel
Thank you.
-V





RE: Sawing time calculation
10 sq inches per min for ally