INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Completion of Partially Fabricated Vessel
2

Completion of Partially Fabricated Vessel

Completion of Partially Fabricated Vessel

(OP)
My shop is an ASME U Stamp holder.  We have been asked to collect the components of a partially fabricated Section VIII vessel from a shop that has declared bankruptcy and complete the fabrication.  The cylindrical shell sections are rolled and long-seam welded; the spun heads are welded to shell sections; some of the circumfrential welds are complete; some of the nozzles are complete. Can anyone offer any tips or potential pitfalls in completing fabrications started by others?

RE: Completion of Partially Fabricated Vessel

2
I have had experience with this in the past at the time of transition from one shop to another a partial data report was made by the shop and AI before shipping.  Completed nozzles, weld seams, shell sections etc were noted in detail on the partial data report.  The quailty of the existing fabrication is unkown, and would be wise to RT or perform other NDE to ensure integity of weldments.  Be advised that componets/sections covered by the parital data report have already meet the requirements of Section VIII, any RT and other NDE would be beyond required by code(duplication of) and customer specifcations, and more than likely be at your cost. In the end this vessel will bear your company name on the nameplate. Referemce UG-11 and UG-120 conerning parts manufactured other than the vessel shop.

RE: Completion of Partially Fabricated Vessel

Review SecVIII UG-10,UG-11,UG-120(c). TALK TO YOUR AIA.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources