INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Culvert Endwalls

Culvert Endwalls

Culvert Endwalls

(OP)
For culvert endwalls with wingwalls, what height do you design for?  Obviously, it would not be full height of the endwall. - It seems that the culvert area does not contribute to the force behind the wall as a typical retaining wall would.  Also, it seems that the wingwalls are helping to support the endwall and vice versa.

In conclusion, it seems that the endwall would be way over-designed if it was designed as a full height retaining wall?

RE: Culvert Endwalls

2858,
     How I've handled culvert endwall design is to provide columns at the ends of the headwall (looking in plan). The columns are placed on either side of the opening, and a construction joint is provided along one side of the column for the wingwalls to tie into. The headwall is then designed to span horizontally between these columns. Wingwalls can provide lateral resistance to the columns similar to shear walls depending on the angle it makes with the columns. Check out the FHWA website (www.fhwa.dot.gov/bridge) to find on line publications that show details for this type of arrangement. This arrangement is better suited for large headwalls that may transfer loads from traffic impact. For smaller headwalls carrying no traffic impact this arrangement wouldn't really be justified and an arrangement that is similar to a vertical wall pinned at the base free at the top usually will suffice (be sure to adequately tie the base of the wall back into the culvert top slab). I use the soil design pressure begginning with the culvert top slab for both arrangements. Hope this helps.

Shepherd

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources