INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

"Self Springing" in "High Energy Piping" systems

"Self Springing" in "High Energy Piping" systems

"Self Springing" in "High Energy Piping" systems

(OP)
Question on "Self-Springing" of High Energy Piping (HEP).
Ref: B31.1 Power Piping Code, Sec. 119.2 "Stress Range".

Given the following scenario:
-HEP Steam System on new combined cycle power plant.
-Chrome-Moly Piping Material (P91 & P22).
-Max Operating Temperature of 1065 degrees F
-Design Pressure 400 PSIG
-Runs at max temp for 6 wks, (1008 hrs) before 1st shutdown.
-System initially fabricated correctly.
 [Zero gap @ Final Field Weld, (FFW) during installation].
-All System stresses well within Code allowables.

Q1. How soon does the self-springing process begin?

Q2. If pipe is cooled/cut @ FFW after 1080 hrs of operation:
    Would a gap be present at the FFW after the cut?

Q3. Suggested references for further investigation?

RE: "Self Springing" in "High Energy Piping" systems

As the elastically calculated stress in the pipe due to expansion and pressure is allowed to go well beyond the yield stress (it might be close and even beyond 2 times the minimum yield stress at temperature) and unless you have quite low calculated stresses with respect to allowables in your piping (and of course you are not in this situation), the piping will immediately yield at some bends. So:
A1. Almost immediately (after reaching a sufficiently high temperature)
A2. Yes, and the initial gap is likely to increase in time due to creep effects.
A3. There are certainly many references treating this subject, but have none to propose. If your intention is to evaluate the gap at FFW, then be careful, it won't be simple, as it will largely depend on the actual yield and creep properties at temperature of the individual heats of piping materials used.

prex

http://www.xcalcs.com
Online tools for structural design

RE: "Self Springing" in "High Energy Piping" systems

Jake52 (Mechanical)and prex (Structural)

I agree with prex (Structural); Also, for the Piping Stress Engineer (ASME B31.1 analysis): Main Steam & Boot Drain to the Condenser use P91 to pass the: (required condition for all of the 209 stress cases). Use the lesser material P22 after the first and or the second valve.

Leonard Stephne Thill
Leonard@thill.biz
www.thill.biz

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources