Is it mandatory to send the PTC along with the equipment for Heat treatment.
There is Only one equipment.
Is it permited to carry out heatreatment of PTC and test it a week in advance and subsequently heatreat the job. Maintaining the same heatreatment cycle. Also providing another PTC along with the job, but not test it so long as the original PTC's heatreatment cycle and the job heatreatment cycle matches. In the event of heat treatment cycle not matching then use the second PTC.
This is avoid unpleasnt surprises after the heatreatment of the job.
There is Only one equipment.
Is it permited to carry out heatreatment of PTC and test it a week in advance and subsequently heatreat the job. Maintaining the same heatreatment cycle. Also providing another PTC along with the job, but not test it so long as the original PTC's heatreatment cycle and the job heatreatment cycle matches. In the event of heat treatment cycle not matching then use the second PTC.
This is avoid unpleasnt surprises after the heatreatment of the job.





RE: PTC for P4/P5 Material
Second PTC is not at all required.
hope this could help u.
RE: PTC for P4/P5 Material
RE: PTC for P4/P5 Material
RE: PTC for P4/P5 Material
Sec VIII Div 2 of ASME
Equipment Name: Hydrobon Reactor, Combined Feed Exchangers
RE: PTC for P4/P5 Material
Please also review SecVIII Div1 UW-40(d).
You of course place yourself at risk by not having the procedure qualified prior to welding the product. So,you can wait till the last minute for the PTC. I am not aware of any requirment to send a test coupon along with the product for PWHT. However if you can it may be good"CYA".
RE: PTC for P4/P5 Material
The Querry was that is it the intent of Code to Weld the Coupon along with the job and send the coupon along with the job for heat treatment.
RE: PTC for P4/P5 Material
Is it the intent of the code that coupon be welded along with the job.
RE: PTC for P4/P5 Material
If you want more,list SAs and thicknesses along with MDMT.
RE: PTC for P4/P5 Material
Code clauses UG-84(i)(1), AT-203(a) & AT-203(b) address the issue. For Category A joints the PTC has (shall) to be welded as an extension of seam unless it is impractical (hemi-head to shell). For category B joints where a separate ptc is reqd (on account of different welding procedures)and category A joints where attaching ptc to the seam is impractical; it has to be welded concurrently or "as close to the start of production welding as possible". The last part has to be agreed upon with the AI "How close is close?".
If it is any help, one can refer back to an interpretation VIII-1-92-181 and VIII-2-92-15 where the then applicable phrase "immediately prior to start of production welding" was interpreted as "welded only sufficiently in advance to allow for prompt heat treatment and impact testing to be completed prior to start of production welding".
I have not come across an interpretation after the wordings have changed but I guess it should certainly be acceptable to weld a ptc a day before production welding provided the welding equipment, materials and location are same. Of course, in case of Longitudinal seams where it is possible to attach the ptc to the seam this would not be permissible.
Does that help?
RE: PTC for P4/P5 Material
Yes Indeed
The info was useful, specifically the reference to interpretation. Thank you.
bmoorthy