INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PTC for P4/P5 Material

PTC for P4/P5 Material

PTC for P4/P5 Material

(OP)
Is it mandatory to send the PTC along with the equipment for Heat treatment.

There is Only one equipment.

Is it permited to carry out heatreatment of PTC and test it a week in advance and subsequently heatreat the job.   Maintaining the same heatreatment cycle. Also providing another  PTC along with the job, but not test it so long as the original PTC's heatreatment cycle and the job heatreatment cycle matches. In the event of heat treatment cycle not matching then use the second PTC.

This is avoid unpleasnt surprises after the heatreatment of the job.

RE: PTC for P4/P5 Material

As per ASME code, it is not mandatory to PWHT the PTC along with the equipment, code permits to simulate the pwht prior to PWHT of equipment. and it need not be the same cycle as PTC provided within the prescribed limitations given for heating rate, holding temp, holding time and cooling rate.
Second PTC is not at all required.

hope this could help u.

RE: PTC for P4/P5 Material

(OP)
Can weweld the PTC Just a day before welding the JOB

RE: PTC for P4/P5 Material

What Code section are you working to?

RE: PTC for P4/P5 Material

(OP)
Section VIII Div 1 of ASME
Sec VIII Div 2 of ASME

Equipment Name: Hydrobon Reactor, Combined Feed Exchangers

RE: PTC for P4/P5 Material

I do not know what process you are using,however I assume you have reviewed SecIX ArticleII and QW407.1 and QW407.4.

Please also review SecVIII Div1 UW-40(d).

 You of course place yourself at risk by not having the procedure qualified prior to welding the product. So,you can wait till the last minute for the PTC.  I am not aware of any requirment to send a test coupon along with the product for PWHT. However if you can it may be good"CYA".

RE: PTC for P4/P5 Material

(OP)
The Procedure is already Qualified, without a qualified procedure the job is not welded However based on  MDMT of the Job and the thickness Impact test is required as per UCS66 and as per UG 84 PTC is to be tested for this job.

The Querry was that is it the intent of Code to Weld the Coupon along with the job and send the coupon along with the job for heat treatment.

RE: PTC for P4/P5 Material

(OP)
The Procedure is already Qualified, without a qualified procedure the job is not welded. However based on  MDMT of the Job and the thickness, Impact test is required as per UCS66 and as per UG 84 PTC is to be tested for this job.

Is it the intent of the code that coupon be welded along with the job.

RE: PTC for P4/P5 Material

Oh! You did not list impacts. I would say you have the option of either way. If it is a high dollar job and I could,I would do both. See UCS-85.

If you want more,list SAs and thicknesses along with MDMT.

RE: PTC for P4/P5 Material

Bmoorthy,
Code clauses UG-84(i)(1), AT-203(a) & AT-203(b) address the issue. For Category A joints the PTC has (shall) to be welded as an extension of seam unless it is impractical (hemi-head to shell). For category B joints where a separate ptc is reqd (on account of different welding procedures)and category A joints where attaching ptc to the seam is impractical; it has to be welded concurrently or "as close to the start of production welding as possible". The last part has to be agreed upon with the AI "How close is close?".

If it is any help, one can refer back to an interpretation VIII-1-92-181 and VIII-2-92-15 where the then applicable phrase "immediately prior to start of production welding" was interpreted as "welded only sufficiently in advance to allow for prompt heat treatment and impact testing to be completed prior to start of production welding".

I have not come across an interpretation after the wordings have changed but I guess it should certainly be acceptable to weld a ptc a day before production welding provided the welding equipment, materials and location are same. Of course, in case of Longitudinal seams where it is possible to attach the ptc to the seam this would not be permissible.

Does that help?

RE: PTC for P4/P5 Material

(OP)
dvk1
Yes Indeed

The info was useful, specifically the reference to interpretation. Thank you.

bmoorthy

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources