INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Doble Testing

Doble Testing

Doble Testing

(OP)
What is the recommended standard for how often Doble testing should be done on transformers.  Also, there is concern in my plant about causing problem hot spots if we disconnect the secondary connections to perform the Doble test.  Has anyone done a Doble test leaving the scondary connections in tact and performing the test with the secondary breaker open?  Did it skew the results notably from the original base line Doble tests?

RE: Doble Testing

Doble testing is recommended once per year for a power transformer. Its recommended to disconnect the secondary connections otherwise you'll get all the equipment up to the secondary side breaker doble tested, which may include secondary side bushing, lightning / surge arresters, secondary side insulators and even the secondary breaker. Normally it’s recommended to get all this equipment doble tested separately so that its test data could be trended and compared later.

I have never attempted to doble test everything together but it definitely should get the results skewed because every piece of equipment has a totally different Capacitance and Doble testing is all about testing Capacitance and Dissipation Factor. So if you have all the Capacitances in parallel you’d get results that are not even near the values for the transformer alone. Why is the capacitance different for the different equipment... because of the different types of insulation or rather dielectric used in the different equipment.

As regards to the HOT SPOTS... I am not sure why do you fear it would hot spots due to testing… is it due to loose connections???  Well first of all, all bolts should be torqued to the specified torque settings. Even it’s highly recommended to check the bolts torque once a year and you’ll be surprised how many loose connections you may find.

Doble Testing (Capacitance and Dissipation Factor Test) if properly conducted by properly trained personnel won’t do any harm to your equipment.


RE: Doble Testing


Take the case of advanced age or environmental deterioration.  If the gear would be rendered inoperable by breaking a busbar or cable joint, it may be in imminent failure mode for any action or inaction, and likely visually bear clear evidence of poor condition.  Isn’t it better to find that during a scheduled outage than during full production or routine facility operation?
  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources