INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pipe sizing

Pipe sizing

Pipe sizing

(OP)
Hello all,

I am designing a sediment basin with a required detention time of 15 hours.  I developed my hydrograph and determined the volume and required discharge.  I need to know how to calculate the maximum discharge from a pipe of given diameter.  The basin is designed to be 3.5 feet deep with the outlet pipe 6 inches of the floor.  Consequently, the pipe could have a head pressure of 3 feet.  Any help is greatly appreciated.

Scott

RE: Pipe sizing

If the pipe is a culvert, open on both ends and relatively short, then use the procedures outline in the FHWA's HDS 5 or the comp prog HY8.  If the pipe is connected to a system, ie: storm drain, then use Hydraulic grade computations.  In either case you can get a priliminary size based on inlet control and then fine tune from there.

Here is a link to FHWA's website:

http://www.fhwa.dot.gov/bridge/hydpub.htm

if you follow the software link to on that page you can dl HY8.

RE: Pipe sizing

For a quick and dirty maximum flow rate, assume a 6" orifice
(Ok if the pipe is very short, like only the width of a 8" wide concrete block retaining wall).  The orifice equation is Q = 0.6*Ao*H^.5, where Ao = pi*.25^2 and H = (3.5-.25) so Q = 0.2 CFS.  Of course, if the pipe end is projecting on the inside, the flow will be reduced, and if the inside pipe end has a nice bell, the flow will be increased.  The analysis assumed a flat, sharp end.  (The constant will change with your units.)
Best of Luck.....

Clifford H Laubstein
FL PE 58662

RE: Pipe sizing

(OP)
I found this equation.  Is this what I'm looking for?  

Q=A*sqrt(2gH/1+Ke+KpL)

Where
Q = Flow Rate
g = Acceleration due to graviity 32.2 ft/sec
H = Head on the pipe
Ke = Entrance Loss Coefficient
Kp = Pipe Loss Coefficient
L = Length of Pipe

Ke = 1
Kp= 5087*n^2/d^(4/3)
Where
n = Mannings "n" for selected pipe
d = diameter of pipe

Is this even close to what I need?

Any help is greatly appreciated.

Scott

RE: Pipe sizing


 Hello,

That seems to be what you need indeed, with A=section of your outlet pipe and H= 3.5feet minus 6inches minus pipe's diameter.
the constants may be different from what I know (working with meters).
Junction headloss: Ke#1/m2 with  m flow coefficent gibfrog was talking about, m equals 0.6 for a standard sharp junction: Ke=1 is for a smoothed junction.  
Linear headloss: Kp can be evaluated using colebrook formula (wich needs iterating) or an analog formula.

I hope this answers to you question...

 David

RE: Pipe sizing

For culverts, there are pipe flow nomographs availabe.  The ones I use I obtained from the Kentucky Higway Drainage Manual.  I suspect most state highway departments will have something similar.  Your culvert manufacturer should also have something.  For a riser, I generally use the a combination of equations for an orifice flow and full pipe flow, taking the minimum of the two solutions.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources