INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

superheater design

superheater design

superheater design

(OP)
we have to design superheater in a waste heat boiler where gas inlet temp is constant at all loads .
superheater to perform from 100 % load to 15 % load .
100,000 kg/hr 45 bar saturated to 440 oc [normal load ]
to perform at 20 % load also
gas temp is constant at all load
gas flow reduses at 15 % load
at 15 % load area is too large ,hence control is problem ,
what design /control you suggest

RE: superheater design

conventional low cost solution is to use a spray attemporator , but one must be certain that the water purity is adequate to avoid  downstream turbine deposits.

If spray water attemporator use  is not desireable, one can use a steam bypass of part of the superheater. This lowers the heat trasferred to the banks with the lowered mass flowrate. At the location where the steam flows will mix, there will be generated thermal stresses in the tee junction that need to be managed.

RE: superheater design

hello,
never seen anyone try to control temperature over such a wide range of loads. normal custom is 100%mccr t0 70%.
athomas236

RE: superheater design

this very same question came up several months ago,

steam bypass is the usual approach,but at sufficient turn down you need to be looking for a way to dump steam to lower pressure headers or to dump it to atmosphere.

be careful of attemporating because you are creating more steam down stream of the superheater. this has the effect of reducing SH duty and compounding your problems.

depending on your process, you may have to consider hot gas bypasses. This will buy you a little flexibility.

you'll need a great deal more instrumentation, controllers and valves. not a cut and shoot design problem, but one that requires careful integration with the mechanical set up and operations. Good luck



Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources