INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Steep Slope
2

Steep Slope

Steep Slope

(OP)
I am investigating options to reinstate a failed steep slope. One option consists of soil filled bags laid to the profile of the slope retained by rock netting fixed using ground anchors at approximate 1.5 metre centres.
Is there a simple way of designing the tension in the ground anchors?

RE: Steep Slope

2
If you anchor to stable rock -we assume- one approach is to anchor the horizontal component of the layer corresponding to an anchor as if the back surface is inclined and of nil friction.  This needs be conservative.

For example, if your slope is 60 deg with the horizontal, and your tributary layer per anchor weight of sand bags is 1 metric ton, each horizontal anchor would have to stand

1 metric ton x tan 30 deg x safety factor (3 ?)

It is just an idea.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources