INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PV - Design Life

PV - Design Life

PV - Design Life

(OP)
Several PV have been manufactured, maintained and inspected as per Code requirements.  The survey intervals have been reduced to four years and provisions are in place for internal protection (coating + sacraficial anodes).  On-line inspection included UT scanning and RBI has been carried out.

Is there any reference to how long these PV can be operated.  Bearing in mind they have been in service well beyond their design life; as an example 40 years.

deanc, I would appreciate your feedback on this issue.

Cheers

RE: PV - Design Life

Generallythey can be operated indefinitely,provided they have no internal or external corrosiong, weld cracking or are not subject to fatigue. A prudent operator would do a full check on the fatigue life that the vessel has seen in addition to checking against corrosion as above.
Also Steels get Aged and their ductile transition temperature shifts upwards over time as they get older their ductile -brittle temperature moves nearer to ambient(say 20C) and can be quite high on old vessels such as 40years + so that they cannot be safely pressured at ambient temperatures..if your ambient is low then it may not be safe to pressurise them...this can be more of a problem with low alloy vessels and more so with thick vessels say over 1" thick...if you can take a sample  then Charpy impact tests would give you an idea what the present condition of the plate is..hope this helps ..

RE: PV - Design Life

(OP)
aybee,

First of all thank you for your responce.  In retrospect your suggestion is to conduct DT to evaluate mechanical properties; in several regards fatigue (life cycles, depending on operating parameters) and MDMT considerations.

I was wondering if there is any code requirement regarding operating life span of a PV.  As an example, OSHA Regulation 29 CFR, Part Number 1926, Subpart D, standard number 1926.64 App C; PSM requires revalidation of design criterion against latest applicable design code and process stream to ensure that the orginal design did not depart from the applicable codes used today and the current service stream.

My question is: does ASME or NBIC state explicitly what number of service years shall not be exceeded, or a factor against design life else the design life.  Or to be in line with your feedback what amount of degradation to the mechanical properties is permissable bearing in mind the implications that this is not a new PV.



Cheers

RE: PV - Design Life

Suggestions:
1.Go to  WWW.Nationalboard.org and have alook at the Draft Addendum for the new NBIC.
2.Visit Nace.org
3.Check Fitness4service.com

Try and obtain a copy of the original code of construction for calculations. Also a copy of the MDR.

Suggest wet fluorescent magnetic particle testing of all weld seams after a thorough cleaning.

RE: PV - Design Life

See RB-9000 in the Addendum. If you cannot obtain this,list your e-mail and I will send it.

RE: PV - Design Life

(OP)
deanc,

a)
Yes you are correct.  WFMPI and UT (TOFD) was conducted and revealed several cracks at different orientations and depths; repairs have been conducted and several PV were scrapped.

b)
aadsani@kockw.com

Cheers

   
  

RE: PV - Design Life

Dear deanc (Specifier/Regul) May 12, 2003
Regards to your reference: (See RB-9000 in the Addendum. If you cannot obtain this,list your e-mail and I will send it.)

I have 2002 NBIC Addeddum, DATE OF ISSUE: 31, 2002, This is the second sddedum issued for the 2001 edition of the National Board Inspection Code (NBIC), NSI/NB-23

An "A02" appears in the margin of replacement page where a change has been made form the previously published version.

REFERENCE TO RB-9000 in the Addendum what page number?

Leonard Stephen Thill
Leonard@thill.biz
www.thill.biz

RE: PV - Design Life

You do not state if your PV's are of riveted or welded construction and what they are used for. In Massachusetts, lap riveted air tanks must be derated after 10 years of service. After twenty years, factor of safety must be increased to 6.

RE: PV - Design Life

Isthill:

You must go to the NB web site. RB-9000 is not yet published. Do expect to see it soon.

pvrv:

Happy to help. Only opinion,as always.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.