INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Budgeting procedures for EPC projects

Budgeting procedures for EPC projects

Budgeting procedures for EPC projects

(OP)
Sirs

I’m working as part of a team to develop new budgeting procedures for EPC projects, which should be lump sum contract. Our concern is about the bid documents, which normally includes basic engineering but many sections only have conceptual engineering. In this way, there is not enough technical data to get a competitive budget. Does anyone have some tips how we should perform to check the engineering provided by the client? I’m looking for some checklist or some criteria to evaluate it. Any comments will be appreciated.

Thanks in advance

RE: Budgeting procedures for EPC projects

Contact Construction Industry Institute (CII) Austin Texas.  They have several checklists and methodologies to validate client documents (mostly type) used as basis for bids.  Content of documents usually has impact on bid quality.  This requires expertise and experience in understanding the drawing's content.  

RE: Budgeting procedures for EPC projects

There are a few good consultancy's around who can help you prepare fully detailed tender documents and also help you perform a high level assesment of the resulting bids. An incorrect methodology can obviously have serious consequences.

RE: Budgeting procedures for EPC projects

(OP)
Thank you for your comments. As you mentioned, although there could be a general criterion to evaluate the technical bid documents, there is no universal "cookbook" approach to substitute good engineering practices. Anyway some checklist is necessary to implement.

RE: Budgeting procedures for EPC projects

Luis:   

You are correct.  The check list is important to make sure you have not missed something.  Good engineering, long term expertise and lesson learned together with the check list are the ingredients for avoiding overruns, contract extras and delayed schedules.

Joe

RE: Budgeting procedures for EPC projects

Luis,

You ask a very important question, and I'm not sure a contract consultant can help find the answer.

When a client requests proposals for EPC work, it would not be financially prudent for them to spend a lot of money on engineering to put in the RFP.  The contract that they hold with their "owner's engineer" typically does not have enough funds to do much proper sizing, optimization, or even good facility siting; never mind permitting costs and scheduling.

This leaves you with the task of doing enough engineering, for free, as part of your bid preparation to back up your procurement and construction costs.  As a result, competitive EPC bids are very expensive to produce.  Every dollar you don’t spend during bid prep on real engineering increases your risk of missing the construction number, or forces you to add contingency dollars that eat away at your competitiveness.

The fact that you have recognized this conundrum means that you are on your way to truly understanding the EPC process.  From here you can see why many large firms are beginning to back away from the EPC process, and why it is not legal for most municipalities to let EPC contracts for public works.

It was the EPC market the killed Stone & Webster, an engineering icon in the US for over 100 years.  On the west coast Reiley Bechtel stated in 2002, "We have done our last EPC project."

I don't mean to be down on clients the let EPC jobs, or contractors that perform them, there are many success stories.  It's just that I have observed the EPC contract as the instrument most responsible for the worst developments in the engineering industry in the last 10 years.

Good luck on your bid!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources