INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Retaining Wall w/ HS20 Loading

Retaining Wall w/ HS20 Loading

Retaining Wall w/ HS20 Loading

(OP)
Can someone help me out with a simple procedure for calculating the additional pressure on a retaining wall from HS20 loading. Can HS20 be converted to an equivilant surcharge? The "retaining wall" is actually the wall of an open top underground tank and it is about 22' tall.

Thank You

RE: Retaining Wall w/ HS20 Loading

Bridge loads are properly for bridges. However there are provisions for retention walls in the AASHTO specs, and you may use these to approximate the effects of the set of point loads.

As well, Section 6 (Culverts) in the Standard same I have (15th ed, 1992) address how to treat effects of wheel loads through earth fills ... even if for vertical loads gives idea of what is reasonable to think.

The same kind of schemes you can search in geotechnical texts, for the integrated pressure coming from the loads.

RE: Retaining Wall w/ HS20 Loading

HS20 loading is often equated to 2 feet of equivalent surcharge.

A more precise way of treating this load is to use Figure 5.52B (in 1996  AASHTO).  

A mathematical treatment of this proceedure was put together by Spangler in a paper dated 1938 Published by Iowa State College.

RE: Retaining Wall w/ HS20 Loading

curvbridger is correct.  AASHTO calls for a traffic surcharge equal to the uniform lateral pressure caused by an additional 2 feet of earth behind the wall.  Refer to AASHTO Eq. 5.5.2-3. AASHTO says this vertical load should be based on 2 feet of dirt weighing 125 PCF unless other data is available about the anticipated surcharge load.  However, some state DOT's, such as PADOT, require additional surcharge beyond the 2 feet of earth.  Pennsylvania has much heavier trucks than the rest of the world so they require 3 feet of surcharge.  Actually, some DOT's require designing for HS25 trucks which have axle loads that are 25% greater than HS20.

RE: Retaining Wall w/ HS20 Loading

Actually, I believe that the AASHTO Bridge Code (1996 with 1997/1998 revisions) say that it is a minimum of 2ft of earh fill.  They also give how to distribute - one area is for bearing and one application is for overturning and sliding.

RE: Retaining Wall w/ HS20 Loading

(OP)
Thank all of you for your replies, this gives me exactly what I needeed.

DHeigher

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources