INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Perry,flash dryer design

Perry,flash dryer design

Perry,flash dryer design

(OP)
Hello,
 For first estimation of flash dryer design,I see this in Perry's (6th ed.) 20-54 (with refer to 20-53):
Q = ua.V.(delta tm)    (eq. 20-35,but applicable for flash dryer,as mentioned)
Ua = 0.5 G**0.67/D     (eq. 20-36,but applicable for flash dryer,as mentioned)
      
(first of page 20-54)For estimating purposes...(in summary):
  1.Assume Vair and Qair then gain Dpipe. ( I:Vair=20-30 m/s but what is the rough number for Qair?)
 2. By use of eq. 20-35 ,gain Ua.(ok)
 3. By use of eq. 20-36 , gain V ,volume of dryer.(Do I gain  Q with required evaporation rate?)
Finally, in page 20-53,I think figures are incompatible:
G=4.8 Kg/s. sqm
D=0.3 m
Then: Ua= 2235 J/cu m .s.K
But in SI eq. 20-36 became: Ua= (26)G**0.67/D

Can anybody clarify me?(with a good example)
                       Thanks






  



Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources