INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Fee Distribution for Typical Building Projects

Fee Distribution for Typical Building Projects

Fee Distribution for Typical Building Projects

(OP)
Greetings Forumer's,

I wanted to get some feedback on what is 'fair and reasonable' regarding distribution of a fee for a Prime Consultant and Sub-Consultants for a typical building project.

Some background information ...

We use a publication from the Alberta Association of Architects/ Association of Professional Engineers, Geoligists and Geophysicists of Alberta entiltled:

'Recommended Conditions of Engagement and Schedule of Professional Fees for Building Projects'

This publication assigns a Category to a particular building type and a range of fee precentages for a range of total project costs.

Similarly, we also look at RS Means Building Construction Cost Data, Reference Section, Reference Number R011 Overhead and Miscellaneous Data, R01107-010 Architectural Fees and R01107-030 Engineering Fees ( Structural Engineering Fees) as a guideline.

My question is:

How does the total Consultant fee get distributed amongst sub-consultants? Example:

Using the AIA method:

Multi Purpose, Multi User Building Complex located in Northern Alberta. Construction Budget is $2,300,000. No unusual project variables.

Building is Category 5, Community Multi Use Centre. Percentage fee calculation:

On the first $1,200,000 ---> 10.43% or $125,160
On the next $1,100,000 ---> 10.15% or $111,650
Total Basic Fee: $236,810

How is this distributed amongst Prime Consultant, and sub-consultants? I am interested in the structural proportions mostly.

One of the Architects whom I work with assigns a value of 8% of fee for structural subconsultant. Therefore, the structural subconsult fee would be 0.08*$236,810 = $18,950 ( round figures)

When I check the RS Means reference ( R01107-010) ... this seems quite low. For the same project as noted above, the RS Means calculation would run as follows:

Building Type: Apartments/Banks/Schools/Libraries/Offices/ Municipal Buildings: Use 7.5% of Total Project Cost( interpolated) yields : $172,500.

This is not too far off the estimate established from AIA/APEGGA.

Then, using R01107-030 Engineering Fees ( Structural Engineering Fees) , the Type of Construction would fall into Hotels/Apartments/Offices/Dorms/Hospitals/Public Buildings/Food Stores (in my opinion) from which the table indicates 1.70% for a project size ranging from $1,000,000 to $5,000,000. This table notes these percentages are included in Architectural Fees.

Using this method, I would calculate Structural Engineering Fees as :

0.017*$2,300,000 = $39,100

In summary, using AIA/APEGGA method, the Architect calculates the value of Structural engineering work as $18,950 while working thru the RS Means method yields the structural engineering fee to be $39,100.

I realize both methods rely upon indices of one form or another. Can anyone else provide me with their experience in this matter?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources