INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Stockpiling

Stockpiling

Stockpiling

(OP)
Are there any tips or rules of thumbs out there for constructing stockpiles (i.e., max height, sideslopes etc.)

RE: Stockpiling

What type of material are you considering, and how much?

RE: Stockpiling

(OP)
Sorry,

I am looking at general clay fill and topsoil. About 1 milliion m³.

RE: Stockpiling

I try to limit the size of a stock pile to 300' by 450', and no more than 30' in height, mostly beacuse I place them in an Insterstate ramp infield.  If you have an area at least 100' in each direction than your pile, start with a small area, end dumping your material, in a double row, 100' long.  I take it you know that you will need a good size dozer, or two depending on the number of trucks and haul you have.  Simply keep grading the row of material and having the rucks bask to the end each time, and before you know it you will have a mound where you can back thre of four trucks up at a time, and let them dump themselves, and the dozer keeps spreading the materail and grading the mound.  I sick with no more than 30' because that allows you to set your excavator on a 15' high bench when you are ready to load the material out.  Working with an excavator, dozer, and loader, you can load out 2500 cy in a 8 hour shift easily, if you have the trucks of course.  This works for about 125,000 cy.

RE: Stockpiling

Don't forget to consider bearing capacity of the soil your'e placing the stockpile on, as well as slope stability of the fill mound slopes. Erosion protection of the fill slopes may be necessary if you are in a rainy area.  Failure to consider these aspects could create quite a mess.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources