INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

High Mast Pole Foundation

High Mast Pole Foundation

High Mast Pole Foundation

(OP)
I am having a problem in designing a foundation for a high mast light pole.  The pole material is concrete and is 135'-0" long.  In analyzing the foundation soils using the Hansen method I obtained an embedment depth of 18'-0".  This number agrees with charts I have according to soil type.  The issue I have is that the typical soil type used in the design extends down to to 15'-0" then the soil boring states there is a rock core.  What should be done in order to obtain the correct embedment for the pole?  Any help would be appreciated.

csterne  

RE: High Mast Pole Foundation

Drill and pin the rock face too resist the overturn moment.

RE: High Mast Pole Foundation

Rock socket - see pp 7 46-49 of Gaylord and Gaylord's Structural Engineering Handbook 4th Ed. There are interesting equations and nomographs that will help you design the right rock embedment depth.

RE: High Mast Pole Foundation

Make sure that the GeoTech has substantiated the properties and magnitude of the rock...weathered, bedrock, shale????, and things like extents of the formation and blow count.  If you have solid rock, you might consider yourself lucky, oftentimes the rock anchors, or most likely in your case a pile socket, can reduce your foundation construction costs by providing a solid moment resisting connection. I have seen jobs where the formation wasn't thoroughly investigated and it resulted a huge change order.

I am gearing up to work on a very tall sewer aerial that must rest on columns, the presence of good rock on my project is a blessing. Primarily because it is close to the surface and I won't have to design a deep foundation.

I concur on the Gaylord reference.  The book is quite dry, but I keep going back to it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources