INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Intralink: update &PROI_REVISION

Intralink: update &PROI_REVISION

Intralink: update &PROI_REVISION

(OP)
Hi All

I have question which has been bugging me for awhile.  In my drawing templates/format is a field set to &PROI_REVISION.  This updates when you change the revision in Intralink, is there a way to update this field in drawing mode without having to save the drawing, close and erase memory and reopen?

Thanks for you help

Tofflemire

RE: Intralink: update &PROI_REVISION

Haven't played with that in Pro/I, yet.

Try this. When you demote the object in Pro/I to allow for modification, change the revision. Then when you open the file in Pro/E, it should read the new value for &PROI_REVISION.

Ben Loosli
CAD/CAM System Analyst
Ingersoll-Rand

RE: Intralink: update &PROI_REVISION

(OP)
Hi Ben

You are correct, that does work, what I'm asking is if you have already made mod's to a drawing and remember that you have not promoted the revision, so you enter workspace and modify the revision, and then back to your drawing without closing it, the &PROI_REVISION field will not update, or I'm not pressing the correct buttons.


Thanks
Tofflemire

RE: Intralink: update &PROI_REVISION

I will see if I can play with this on my install of Pro/I.

The whole concept of te way PDM works within CAD is going to be a challenge for us. We have been on UG for 15+ years and have been managing our data with a home-grown PDM. When we do a save-as to the existing part file, it updates the revision attribute, but the designer still has to run te drawing format program to update the revision on the face of the drawing. At least that is minor compared with your having to close, erase and reopen the part.

Ben Loosli
CAD/CAM System Analyst
Ingersoll-Rand

RE: Intralink: update &PROI_REVISION

You may be using PROI_REVISION from the model or from the drawing but whichever you use this is the procedure:-
1) Save changes of everything that you have modified in the current ProE session
2) Refresh the workspace browser then set the revision and any other attributes of the drawing and/or model that you might use in the drawing.
3) Go back to Pro-E and select FILE-REPLACE. N.B. This can overwrite all objects in current memory, hence the importance of step 1.
4) The drawing should now be correct but if necessary refresh the display.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources