INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Acceptable O2 level to avoid SCC in anhyd-NH3 service for PWHT vessel

Acceptable O2 level to avoid SCC in anhyd-NH3 service for PWHT vessel

Acceptable O2 level to avoid SCC in anhyd-NH3 service for PWHT vessel

(OP)
Hi, I work in a ammonia-urea plant and our NH3 stage is done in pressurised vessels. The vessels were design and fabricated to BS5500 in 1981 and have been in service since 1982. The vessels were manufactured using BS1501-224-32A-RT (with spherical dish heads) and all weld joints were post
weld heat treated (PWHT). With regards to water and oxygen levels during service we have been able to maintain:-
* 1000 ~1500ppm of water measured in liquid phase;
* 35 ~ 50ppm of Oxygen level measured in the gas phase (with the exception of high levels for one to two  months after internal inspection of the vessels ex 950ppm at start up for several days and then down to 200ppm within a week or two).
The current inspection interval of the vessels is set at a 6-yearly interval and we use wet fluorescent MPI surface NDE method to test welds/heat affected areas for SCC cracks. Fortunately up to date we have not found any SCC cracking problems in the bullets (nor in other anhydrous intermediate process vessels).
We are reviewing the inspection frequency for the ammonia storage bullets and planning to extend the interval to 9-years. The basis for extended inspection interval is based on the fact that the opening of the vessel for internal inspection could create more risk (due to the high oxygen levels we get after these inspections can cause SCC cracking problems as we typically operate the vessel with 1000ppm of oxygen and after many purging cycles operations manage to get the levels down to 100ppm in about two months time) of initiating a SCC cracking problem.

I would appreciate feedback on the oxygen level/s that is acceptable in anhydrous ammonia service vessels that were PWHT. Based on our past vessel inspection experience I am currently using the figure of 50ppm (in the gas phase) as acceptable for out PWHT vessels, pending that the water level is kept above 1000ppm in the liquid level.
I would take this opportunity to thank you in advance for your time replying my inquiry.

Regards

Leonard Seneviratne
Senior Mechanical Engineer

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources