INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Crane longitudinal load application for seismic combination

Crane longitudinal load application for seismic combination

Crane longitudinal load application for seismic combination

(OP)

Dear members,

The question is regarding crane longitudinal load application and combination with seismic check.  When crane is under operation in between aisle columns/ interior columns , how to check for seismic forces with crane capacity?  How to account for % of crane load for seismic check like in other live load case?

RE: Crane longitudinal load application for seismic combination

Usually only the dead load of the crane is considered for seismic applications for cranes.  The lifted load is not rigidly attached and can swing at a slow frequency so it is ignored.  For the seismic load the dead load of the crane should be treated just like the building.  See thread 507-26112 Bridge Crane Seismic loads on Buildings.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources