INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Testing Tubing while POOH

Testing Tubing while POOH

Testing Tubing while POOH

(OP)
Hello all,

This is my first post and I can guarantee I will have plenty more with ignorant questions and absurd proposed methods.
I will be recompleting a rather old well (last wellbore diagram was in 2010). I have watched a rig test tubing before but cannot recall the most efficient method.
Tubing is 2-3/8" 4.7# N-80, Packer is 4-1/2" Arrow-Set 1-X.
I will need to unseat and POOH w/ packer anyway to set CIBP & cement in the 4-1/2" casing.
Is their any method that would allow me to test tubing integrity using rig pump and pumping down casing and capping each joint of tubing with bull plug and pressure gauge?
Or another variation using the wireline truck? As always I am trying to do this safely and cost-effectively.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources