We are modifying an Existing vessel (20 years old), Modification scope is replacing the existing boot with new one of large size. I would like to know after modification wheather the vessel can be done for the full hydro test or only the modified portion to be hydro tested.??





RE: Hydrotesting for ASME Sec. VIII Vessel.
However, if it were in my jurisdiction, the answer would be yes to the full vessel.
RE: Hydrotesting for ASME Sec. VIII Vessel.
Regards,
Mike
The problem with sloppy work is that the supply FAR EXCEEDS the demand
RE: Hydrotesting for ASME Sec. VIII Vessel.
Some temporary arrangement is required at the Modified portion to isolate for hydrotest.