INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Contractors Means and Methods in Construction

Contractors Means and Methods in Construction

Contractors Means and Methods in Construction

(OP)
Hi,

Can anyone please direct me to a good book in which describes the means and methods used by contractors for construction, like how they would construct an abutment for example,

Am an office engineer and not having that experience always puts me in a hard spot where am not sure how things should be detailed for the ease of construction.

Thanks,

RE: Contractors Means and Methods in Construction

BridgeE - As a former bridge contractor, I don't know of a book on contractor's means & methods for heavy construction. For activities such as concrete forming and superstructure falsework, a contractor will look at the issue "backwards" (as I like to say). That is, figure out how to accomplish the work with what he has or can obtain economically, not with the optimum material (which he would have to buy or rent).

Here is an example; we used HP 12x53 as temporary falsework support beams (often 27' long) for flat slab bridge decks. The HP were (spliced) "free" pile cut offs left over from previous projects. (Note: The splicing was also "free"). Doubt anyone would intentionally specify an HP as a beam.

Your interest is easing construction will be much appreciated. In general terms, look at designs that reduce construction labor at the expense of using more permanent material. A extra few yards of concrete is "cheap". Saving labor not only saves time and reduces direct labor cost, but also reduces liability insurance, workman's, compensation, and an assortment of other overhead tied directly to a contractor's total labor cost for a project.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Contractors Means and Methods in Construction

(OP)
Many thanks SlideRuleEra for this answer, makes a lot of sense.

RE: Contractors Means and Methods in Construction

It has also been my experience that means and methods can be unique to each contractor.......ask 20 different contractors how to build something and you will get 20 different answers.

RE: Contractors Means and Methods in Construction

I dont know of a book but picking up the phone or making a site visit and asking a contractor how he/she would build it goes along way. I know we are mostly concerned about the end result but if you can make it easier for the contractor and achieve the same result then why not?

RE: Contractors Means and Methods in Construction

I agree with both responses.

Quote (ask 20 different contractors how to build something and you will get 20 different answers. )

And sometimes they'll bid items then figure out later how to build it. The best way to learn how things get built is to actually watch it being done. Even then, you'll learn that there are 20 different ways.

For some items of work - bridge jacking, complex steel erection - you may need to present a suggested procedure. When you're preparing plans ask yourself can someone accurately bid this based on the information shown. A bidder may spend only a minimal amount of time at a site, so he/she's relying on your plans to be buildable and to convey the information needed to build it, which would include, storage areas, access issues, interferences, etc, and of course, how is everything paid. I hope this helps a little. There's a lot to it because there are different elements in a set of bridge plans and some need more detail than others.

RE: Contractors Means and Methods in Construction

(OP)
Amazing answers !

Thanks all,

RE: Contractors Means and Methods in Construction

BridgeE:
Despite the fact that you are primarily an office engineer, you should have a fairly good idea how things go together and how they are built. You should try to get out in the field, assisting in observation and inspection, etc., at first. Ask your boss if this can’t be arranged, so that you are learning some of these aspects of the engineering profession too. It will make you much better at what you do in the office, and I suspect your boss knows that too.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources