INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Anchor Block Mitigation in Pipeline

Anchor Block Mitigation in Pipeline

Anchor Block Mitigation in Pipeline

(OP)
Hello All,

Currently we are designing a pipeline 12" CS (API 5l X 52) with a design pressure of 140 barg and design temperature of 93 deg c. The length of the pipeline is 1.6 km.

We wanted t o remove the requirement of Anchor block. currently we are trying to change the routing to station approach by providing a loop and also increasing the cover depth.

Is there any other method with which we can mitigate the same.

Regards,
B

RE: Anchor Block Mitigation in Pipeline

jonjose123,
You wrote: "we are designing a pipeline 12" CS (API 5l X 52)"
It seems to me that if you are using Butt Welded Carbon Steel piping (and fittings) you would not need "Anchor Blocks" of any kind.

So,
(a) what makes you think you may need Anchor blocks?
(b) how many anchor blocks will you have? and where would you place them?
(c) what kind of soil will you encounter in this 1.6 km?
(d) how big are these anchor blocks going to be?

Sometimes its possible to do all the right things and still get bad results

RE: Anchor Block Mitigation in Pipeline

jonjose123

I've had a look at a couple of your previous posts, the most recent being a similar question about above ground pipelines at the same temp and pressure.

you don't seem to be very good ant answering questions or responding to posts so before I spend much longer you need to answer the questions above and give us a bit more response / feedback / explanation.

It would seem the pipeline is buried and welded, but please confirm?
what is operating temp?
what is the issue - excessive expansion, stress, what?
What is the installed temp?

LI

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: Anchor Block Mitigation in Pipeline

(OP)
Dear All,

Apologies for the delayed response as I was on medical leave for week.

Little Inch: from here on I will be participating in all forums related to pipelines.

Regarding the question, the pipe is buried and and the operating temp is 78 deg celciuis.

We have done an analysis in Caesar ii and the displacement we are getting at the pig trap is around 24 mm.

However, there is an existing 30" pipeline from which we are taking a tap off with build barred tee. The Tap of size is 30 x 12" bared tee.

Client has raised the concern regarding the expansion at this barred tee.

From the buried barred tee the line connects it to the by pass line of the above said 12 inch pipeline which runs of r1.6 km.

Its a desert area.

Client is insisting on Anchor block as they concerned about of 25 mm expansion at pig trap and also asked to check the expansion at the underground barred tee 30 x 12".

Once again apologies for my less participation.

Regards,
J

RE: Anchor Block Mitigation in Pipeline

jonjose.

Thanks for the update, but next time please add this sort of relevant information to your first post.

Expansion and stress issues at buried tie-ins are complex and very much depend on the potential movement of each item, space available, etc.

If the 30 x 12" tee is in the middle of a long straight run of pipe it basically shouldn't move. However the end of your pipeline will.

You therefore need to look at various layouts which can either accommodate that movement such that the stress on your buried tee is within design limits. A section of above ground pipework with an expansion loop arrangement might work, but the devil is in the detail. Similarly if you can include some buried bends just before you come into the pig trap then this will reduce your movement.

This may be one place where some sort of restraint or anchor block is required.

If you can post or sketch an arrangement of this connection it might be possible to offer some guidance, but otherwise it's all a bit vague.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close