INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tc pipe segments as well as Modeling as No-Storage ponds?
3

Tc pipe segments as well as Modeling as No-Storage ponds?

Tc pipe segments as well as Modeling as No-Storage ponds?

(OP)
Hi all,

I'm having a senior moment. I can't recall the BestPractice with regards to Tc segments through a subcatchment.

I prefer to model catchbasins, drain manholes and the piping using insignificant-storage ponds.

But... should these pipe segments be included as Tc segments as well?
Or does the fact that the ponds are included in the routing take care of the time?

Thanks

Craig

___
Craig T. Bailey, PE, LLS
www.bailey-associates.com

RE: Tc pipe segments as well as Modeling as No-Storage ponds?

It all depends on how one is configuring your hydrology & hydraulics model. If a pipe segment is part of the Tc (hydrology) it should not be modeled in the hydraulics (that would be accounting for it twice). If one models the pipe segment in the hydraulics, the Tc should end before entering the pipe segment.

RE: Tc pipe segments as well as Modeling as No-Storage ponds?

(OP)
TerryScan I believe I now understand your answer. Thank you

If the pipe segments WERE NOT included as Tc segments, the subcatchment would need to be broken up into a smaller subcatchment that is draining towards the inlet of an insignificant storage pond. This way the hydrology model would not "see" the flow in the pipe, but the hydraulics model would be able to report on flow values.

Since the hyraulics in the closed drainage system are more of interest in my current case, I will break the subcatchments into per-catchbasin sub-subcatchements, and route the primary outflow from insignificant ponds to the next lower pond. Each sub-subcatchment will flow the hydrology (overland) into the next lower insignificant pond.

in that way, Tc segments are the simple overland flow segments and need not be concerned with any Tc pipe segments.

My problem is when we are to model an entire closed drainage system with ponds... there are instances where these "sub-subcatchment" could be as small as one half-lane, the length being the distance between catch basins. Surely that approach (tiny tiny subcatchments) is not valid when applying classic SCS methods such as TR-55 and TR-20?

___
Craig T. Bailey, PE, LLS
www.bailey-associates.com

RE: Tc pipe segments as well as Modeling as No-Storage ponds?

Tiny subcatchments are not a problem. As the Tc goes to zero your runoff will approximate the precipitation excess, with essentially no time delay between the precipitation and the runoff.

Peter Smart
HydroCAD Software
www.hydrocad.net

RE: Tc pipe segments as well as Modeling as No-Storage ponds?

2
Craig,

As with a multitude of things we face in engineering, there are "many ways to skin the cat." The typical workflow I have used in over 25 years of experience is this:
Pond level Hydrology & Hydraulics (H&H) is modeled using SCS methods. Most closed drainage systems are not specifically modeled and included in Tc paths. The exception would be drainage systems which connect ponds or are part of pond outfalls.
All other Closed Drainage systems are modeled using FWHA /Rational Methods analysis of flows, gutter spreads, inlet capture & bypass, and pipe capacity.

RE: Tc pipe segments as well as Modeling as No-Storage ponds?

Terry's biprocedural method of cat skinning is the method to which I adhere, and most other professionals I've encountered do it similarly.

One thing I sometimes do, is use the calculated Tc from the proposed pipe network, as reflected in the rational analysis, as my Tc for my single node SCS pond analysis.

Hydrology, Drainage Analysis, Flood Studies, and Complex Stormwater Litigation for Atlanta and the South East - http://www.campbellcivil.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources