INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Load from freight train

Load from freight train

RE: Load from freight train

the AREMA manual will give you the loading (Cooper E80, which you can also just google) and other pertinent information related to the design of structures exposed to train loadings.

As for the effect on piles, depends on soil types so best consult the geotechnical engineer on the project.

RE: Load from freight train

Generally, for the lateral surcharge pressure acting on a wall or foundation piles, you take the maximum specified train's axle load and then divide the axle load by the axle spacing and the track's tie width. Then, you use a Boussinesq strip load surcharge with the vertical pressure acting on a strip width equal to the tie width. For example, AREMA's Cooper E80 train surcharge is an 80,000 pound axle divided by a 5' axle spacing and an 8.5' tie width = 1882 psf vertical surcharge on an 8.5' width strip. You should check with the particular railroad with which you are working for their surcharge requirement. Some railroads also require you to multiply the vertical surcharge by an impact factor. For vertical loads acting on foundation piles, you will have to design the substructure foundation to get the vertical loads on the piles.

www.PeirceEngineering.com

RE: Load from freight train

I once had a job where a corrugated metal culvert had been under a rail road as a pedestrian passageway under an embankment carrying the railroad (one track). In the construction handling of it the elliptical shape was severely bent such that some feared that it might collapse under the train loading. Top of passageway was about 2 to 3 feet under the ties. Seeing the distortion (after the job was a year or more old) locals decided to close off the use due to possibly a failure. Trains were carrying iron ore. I set up dial gauges on adjustable "pipe" supports to measure both vertical and horizontal deflection. The plan was to see if continuing distortion would eventually result in failure. I was able to have control of the position of standing units of the train, as well as observing the conditions with moving train. Over a period of a month or so periodic measurements were made. The measurements were stopped when it became clear that no permanent distortion was present from start to last observation date. Deflection in both vertical and horizontal directions was readily observed with the set-up as the loads came and went. They were well within the range of the 2" throw dial gauge range. Interesting to note the locomotive caused deflections were significantly less than the loaded cars. The deflections were clearly in the elastic range in spite of the severe distortion of the "tube"..

RE: Load from freight train

(OP)
Thank you all for your advice!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources