INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Fatigue Limit Calculation of Mechanical Couplers

Fatigue Limit Calculation of Mechanical Couplers

Fatigue Limit Calculation of Mechanical Couplers

(OP)
Currently, I am involved in the design of a bridge. We are utilizing mechanical couplers in lieu of lap splicing. We are just following the code prescribed guide that the tensile strength developed by the mechanical coupler should be at least 1.25 x Yield Strength of the reinforcing bar it joins. At first, but all of a sudden, our client is insisting that we show calculations proving that the mechanical coupler can last up to x million load cycles. As I have read in NCHRP 10-35, there is no analytical method/ calculation available for this. Would like to know if you have previous experience like this and how did you get away with the consultant's request. Or if there is already an analytical method to solve this or more detailed guidelines available.. sharing the said info will highly be appreciated. Thanks!

RE: Fatigue Limit Calculation of Mechanical Couplers

Cgseso:
If the manufacturer of the coupling hasn’t done this fatigue limit testing, it probably hasn’t been done. And, that’s that. Otherwise, the job ain’t worth it to sell a few couplers They are already designed and built to take 1.25 times the bar strength and that test data is assumed to be available. They have been used for years with very few, if any, failures. And, that’s really all that can be said. With all else going on around them, it is not as simple as a test of the bare bar and coupling. And, that has to be the way you sell them. Was this requirement in the original spec, or is it a change order or extra? If the client wants to pay for the fatigue testing go for it. . Sometimes clients want the moon, but aren’t willing to pay for two bits worth of common sense and engineering logic and experience.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources