INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Basement Design - Industry norm?

Basement Design - Industry norm?

Basement Design - Industry norm?

(OP)
Hi All,

I'm just wondering what people do and what general practice is for basement design.

What I have is a one storey car park basement level with 3.5m of hydrostatic pressure (on slab and walls). I believe the structure will be tanked on the exterior (non-structural) and I was wondering is this sufficient or is there additional requirements to control crack widths in the structure (as kind of a contingency)... what is industry norm for this kind of thing? I'm from Europe so is there any guidance publications that may be useful to me? I found TCC Concrete Basements publication.

Also, my slab is pretty irregular (no common grids) so checking cracking at major locations will be long and gruesome. Is there a simplified way to do this or am I over-complicating the issue?

Thanks in advance!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources