INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Stiffened Seated Connections - Roll Clips

Stiffened Seated Connections - Roll Clips

Stiffened Seated Connections - Roll Clips

(OP)
Currently working up some details for large beams framing into WF columns. For instance, a W36x800 framing into a W12 column with ~530k end reaction.
We're going with a stiffened seated connection, however I'm wondering what I should do about the roll clip. AISC states that an L4x4x1/4 is "generally adequate", but doesn't go into any detail about sizing this piece. The small angle doesn't look right. I'm wondering what, if anything, I should figure for sizing this angle?


RE: Stiffened Seated Connections - Roll Clips

I admit I'm probably behind with OSHA regs.....but if the T/seat was put in first (and connected to the W36), wouldn't that be adequate (by itself) for safety purposes during erection?

RE: Stiffened Seated Connections - Roll Clips

(OP)
The T seat will be shop welded to the column & everything will field bolt up. OSHA will certainly be satisfied on the 2 bolt requirement.

Does this clip even do anything once the slab is poured?

RE: Stiffened Seated Connections - Roll Clips

Quote:

Does this clip even do anything once the slab is poured?

It use to be an alternative to the top angle (i.e. a angle connected to the top flange). But I was never a fan of that. But you will need either one or the other for the final product.

But for erection purposes.....I would think bolting to the seat would be enough.

RE: Stiffened Seated Connections - Roll Clips

Quote (SBI)

Does this clip even do anything once the slab is poured?

Depends. If you've got steel joists on top of this beam, your beam top flange might be unbraced for the span cantilevering from the first joist back to the column. I don't know if there's a rule about it but I think it's good practice to provide non-slab dependent rotational restraint at the ends of all beams. We do, after all, assume that rotational restraint in all of our calcs. It ought to be a positive and convincing thing in my opinion. I don't necessarily object to the clip that you're currently showing but I do feel as though it ought to be capable of AISC appendix 6 bracing capacity just like any other flange bracing.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Stiffened Seated Connections - Roll Clips

Are you looking for rotational restraint of the beam? You've got it big time...

Dik

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources