INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Automated water meter reading systemms

Automated water meter reading systemms

(OP)
Over the last 10 years the utility that i work for has been trying to operate and progress to AMR for over 12000 meters. This has been expensive and such a disaster that as the electronic meters come up for replacement we are going back to old style manually read meters.

This is not in my direct area of operations but i have had some involvement in the whole process and there were faults at many levels in the implementation and transition to AMR.

We have had problems with the meters themselves, the drive by meter reading software, and integration into billing software. The meters were so bad that we were reading most of the meters manually anyway. Our situation does not seem to be an isolated account.

Are other people generally having the same problems?

Regards
Ashtree
"Any water can be made potable if you filter it through enough money"

RE: Automated water meter reading systemms

ashtree,

Sorry to hear about the problems your company is having.

I started a new water system about 4 years ago and implemented an AMR system with a drive by system. So far it has worked fairly well, but on occasion it takes a few minutes on some meters before they will pick up the read even though we are right next to them, while others will read from over 1/4 mile away. Sometimes it seems to be because of different atmospheric conditions, other times who knows. We currently have less than 100 meters in a rural area, but expect around 4,000 at build out.

We have not had an issue between the meter reading software and the billing software. It seems to work really well.

Let me know if you have any specific questions.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close