INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

(OP)
Dear Experts,

Our client has this requirement in their WPS regarding pre-heating of A333Gr.6 and A671 material(pipe) with nominal wall thickness of 20mm-50mm to min.temp of 100-120 deg.C and pre-heat maintenance is also required by using resistance heaters/gas torches, maximum interpass temperature 300 deg.C. Heat treatment is also mentioned(not an issue).

1) In B31.3 it only requires pre-heating of P-No.1 (Carbon Steel) wall thickness >25mm to 95deg.C at %C>0.30. Therefore it contradicts to our clients WPS parameters right?
2) We want to weld an NPS 80*20.62 Carbon steel pipe but currently we have below 10deg.C ambient temperature. How we can normally proceed? does the requirement in the mentioned WPS does make sense during welding at low ambient temperature? with regards to pre-heating and pre-heating maintenance?
3) Is there a risk of cracking if pre-heating is not adhered?
4) Any recommendation on how we can fully achieved pre-heating temperature if we will weld CS material at NPS 128 and WT>30mm?

Regards,
Delikado

Expecting life to be fair on you because you're a good person, is like expecting an angry bull not to charge on you because you're a vegetarian.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

1) No, your client spec overrules (or actually; sets additonal requirements to) B31.3. Refer to B31.3 para 300(b)(1) and 300(c), all point, and specicially 300(c)(5).
2) What exactly do you mean with "but currently we have below 10deg.C ambient temperature"? Is it 10 °C ambient or -10 °C ambient? And which requirement do you mean with "does the requirement in the mentioned WPS does make sense during welding at low ambient temperature"? Also, you have an NPS 80 pipe, i.e. 2 metres diameter?
3) Yes
4) 3.2 meter diameter pipe? Not sure how you can do that.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

(OP)
2) What exactly do you mean with "but currently we have below 10 deg.C ambient temperature"? Is it 10 °C ambient or -10 °C ambient? And which requirement do you mean with "does the requirement in the mentioned WPS does make sense during welding at low ambient temperature"? Also, you have an NPS 80 pipe, i.e. 2 metres diameter?

- it is 10°C ambient (sorry about that but soon we will have -10°C.
- I mean that requirement of Pre-Heating to 100°C, since we are only welding DN2000 pipe with wall thickness of 20.62mm as per B31.3 required is only 10°C
- NPS80 which is equal to DN2000.

4) 3.2 meter diameter pipe? Not sure how you can do that.

- What I mean is NPS128 approx. equal to DN3200 with wall thickness of >30mm.

Okay let us make it like this, WPS was prepared by our welding engineer and we both work in the same organization.

Regards,
Delikado

Expecting life to be fair on you because you're a good person, is like expecting an angry bull not to charge on you because you're a vegetarian.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

As you brought up client requirements, there's something extra here need to be taken into account.
2) Review table 330.1.1. If your client does not specify anything additional to this, stick to the table.
4) Whats the carbon content? Does your client specify additional measures for preheating in their specs?

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

(OP)
4)%C=0.25, WPS states that Preheat temp. should be minimum 100-120°C ; Preheat Maintenance Resistant heaters/Gas Torches, so aside from WPS nothing else.

Regards,
Delikado

Expecting life to be fair on you because you're a good person, is like expecting an angry bull not to charge on you because you're a vegetarian.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

So you are using your client's WPS. This would assume that you have no WPS to support your work, in which case you need to follow the WPS given to you by the client. As ambient temps decline below 10 C, it is a good idea to preheat, especially below 5 C.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

As stated above, follow your client's requirements. Preheating is a good practice for carbon and low alloy steel weld joints.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

If you are working to B31.3 then it is pretty likely your WPS is in accordance with ASME IX.
If so preheat is an essential variable.
Decrease greater than 55 degrees celcius of "that qualified" requires requalification.
As you are using clients WPS do you know what the PQR states regarding preheat ?
Was it qualified at 155 degrees celcius and subsequently reduced to 100 degrees on the WPS ????
Or was it qualified at 100 degrees ?
Irrespective of all the above you cannot weld using that WPS with anything less than a 45 degree celcius minimum preheat (100 minus 55 degrees as per QW 406.1)
Regards,
Shane

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

In addition
B31.3
330.1.1 Requirements.
………………………Higher minimum preheat temperatures may be required by the WPS or by the engineering design.

RE: Pre-Heating of Carbon Steel pipe with 20 mm wall thickness and at low ambient temperatures

(OP)
Thanks for all of your input guys.

Regards,
Delikado

Expecting life to be fair on you because you're a good person, is like expecting an angry bull not to charge on you because you're a vegetarian.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources