Why arent corroded conditions considered for nozzles ?
(re-enforcement pad calculations)
(re-enforcement pad calculations)
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
|
RE: ASME ASME ASME
RE: ASME ASME ASME
When calculating A2; (area avaliable in the nozzle)
corroded conditions are not being considered by ASME
consequently RF-Pad size decreases. In other others
the corrosion allowance (at the start) is considered towards the reduction of the RF-Pad dimensions.
Please advise & provide insights
thanks
RE: ASME ASME ASME
Fig. UG-37.1 might help you in understanding the definitions of tn and trn. The measurements start where the corrosion allowance ends. That would be the dashed line on the inside with the "c" dimension on the inside left hand side. The corrosion allowance is shown for the shell, inside projection of the nozzle, and outside projection of the nozzle.