×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NX 10 arrangements

NX 10 arrangements

NX 10 arrangements

(OP)
Hello,
is it possible to synchronize the arrangements between the assembly levels? (at once, and not click by click to every single arrangements, is there a table or something for that?)

An example here:
In BgABC I have 3 Arrangements:
-Arrangaments1
-Arr_ABC
-Arr_ABC_Move
In subassembly I have also 3:
-Arrangaments1
-Arr_ XYZ
-Arr_ XYZ _Move
If I select the Arr_ABC in the top assembly, the Arr_XYZ should be also selected in the low level assembly.
If I select the Arr_ ABC _Move in the top assembly, the Arr_ XYZ _Move should be also selected in the low level Assembly.

The question is general, we have an Assembly with much more levels and much more arrangements. We know that the Top level arrangements can remember to the low level arrangements, in which context they have been used, but in this case we should show to NX every possible Arrangements click by click) we need a simple solution how could we set them at once, just like a table or spreadsheet.

RE: NX 10 arrangements

You can make equations to move components by constrains when other components are moved (either measurement or equation driven). You can make suppression by equation. I am not aware of possibility to connect arrangements with anything. I really hope that I am wrong.

_____________________________
Enjoy your work and have fun!

RE: NX 10 arrangements

You have to realise that Arrangement information is only stored on the Parent of an assembly. Which basically means that they only work in that level and can only be driven from that Assembly.
If you want to drive subassemblies with an arrangement, then that arrangement must be created at the top parent level.

Ronald van den Broek
Senior Application Engineer
Winterthur Gas & Diesel Ltd
NX9 / TC10.1.2

Building new PLM environment from Scratch using NX11 / TC11

RE: NX 10 arrangements

(OP)
NutAce: sorry for my english :) i think you didn't understood me well.
"If you want to drive sub-assemblies with an arrangement, then that arrangement must be created at the top parent level. "
Not exactly so, i already wrote above: i can show to NX: which sub arrangement belongs to which top arrangement, and this information stored in the top level assembly.
My only problem is: this needs a lot of effort.
1. Select the top arrangement 1
2. Select every single sub arrangements that I need activated in top arr 1.
3. Save
4. select the top arrangement 2
5... and so on.

For this little test assembly above it works well.. but imagine that you have hundreds of parts, and sub assemblies and arrangements... Horrible.

RE: NX 10 arrangements

Hi dihen

I'm with you in this hard work to do simple thing

I think nx can help in this work something like this.

When I come to select an arrangement nx can helped
in opening a dialog with a hirarchical tree of all the
arrangements in the Assembly tree so I can select
Witch sub Assembly arrangement I wantto see

Thanks for this post.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources