INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Questions about HAZ and NDT for piping
3

Questions about HAZ and NDT for piping

Questions about HAZ and NDT for piping

(OP)
My customer has asked me to increase a distance between two welds on a pipe at least 50mm(welded toe to toe), which is now 45mm from each welding center as shown in the attached picture.
Unfortunately, the distance cannot be increased anymore due to several reasons. I therefore am trying to find a way to persuade the customer to keep the current condition.

It would very helpful to me if you could let me have answers to the followings:

* Pipe info.
- Pipe size: 250A(Thickness: 9.3)
- Pipe mat'l: Carbon steel (JIS CODE: STPG370-ERW)
- Medium: Lub. Oil (Working pressure: under 3 bar)
- Welding: Butt welding

* What I need to know
1) Is there any possibility to overlap HAZ of each welds? How can I calculate width of HAZ?
2) If HAZ is overlapped, What problem occur?
3) What should I do to verify integrity of the pipe? Welds penetrant test alone is enough to verify? or is any other examination necessary?

Hyunik Cho

HYUNDAI Engineering & Technology
Ulsan, South Korea

RE: Questions about HAZ and NDT for piping

2
Who cares whether the HAZ overlaps? The material is low carbon steel pipe that is manufactured using hot roll plate or pierced at temperatures above the lower critical transformation temperature and utilizes uncontrolled cooling rates. Welding is unlikely to change the mechanical properties. Having said that, if notch toughness requirements apply or if the base metal was not low carbon steel, it would be a different conversation.

The HAZ of two adjacent welds is no different or detrimental than two adjacent weld beads in a groove weld that requires several passes to complete.

Unfortunately, there are many old wives tales that people believe.

That isn't to say there are not materials that could be affected by multiple thermal cycles, but carbon steel; not so much. If this was austenitic stainless steel subject to sensitization, yes, it could be a problem. If the base metal was heat treatable aluminum that is sensitive to time at temperature; yes, it could be a problem. More than likely the problem is the person involved probably saw the limitation on another project, but didn't appreciate why the restriction was in place.

Best regards - Al

RE: Questions about HAZ and NDT for piping

Al - you have answered well.

(1) A little knowledge is a dangerous thing.
(2) There are legions of amateur welding engineers (refer to (1) above).

RE: Questions about HAZ and NDT for piping

Thanks for the vote of confidence.

Best regards - Al

RE: Questions about HAZ and NDT for piping

(OP)
Al, many thanks for your answer. I learned much more from you than what I got from google for half a day.
I'm now trying to persuade the customer with an explanation based on your answer.

Ironic metallurgist, I will keep your first words in mind.

Hyunik Cho

HYUNDAI Engineering & Technology
Ulsan, South Korea

RE: Questions about HAZ and NDT for piping

Happy to help.

Best regards - Al

RE: Questions about HAZ and NDT for piping

See thread378-242240: Minimal Weld Spacing in Piping for the length discussion of the subject.
IMO, without any Code or Standard, the design may be based on the project specification and/or the owner requirements.

RE: Questions about HAZ and NDT for piping

That is the touchy one - " Owners requirements"
If it is not listed in the applicable codes, project specs or any other contract documents the client has no right to require anything.
Basically, they get what they paid for !
Cheers,
Shane

RE: Questions about HAZ and NDT for piping

Owners always have the right to specify additional requirements to the Codes within the Contract. If done after the signed Contract, a Change Order is required to be agreed upon by both parties to the Contract.

In the OPs case, gtaw is absolutely correct. In any event there will be no overlapping of HAZs and the thickness and distance involved will not induce any unreasonable weld residual stress on the miter like narrow component.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources