INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

EOR Responsibilities for Precast Roof System

EOR Responsibilities for Precast Roof System

EOR Responsibilities for Precast Roof System

(OP)
What would you guys say is the EOR responsibilities for a double tee roof system? Particularly the connection design to a tilt up wall for diaphragm loads and out of plane wind loads on wall.

RE: EOR Responsibilities for Precast Roof System

Around here, it's likely that the double tees and the wall panels would be designed and fabricated by the same company, therefore we would typically specify the roof loading, and then the line loads from the diaphragm and out of plane loads. It's also likely that we would show some form of expected connection detail, but we would leave the actual connection specifications to the precast supplier.

RE: EOR Responsibilities for Precast Roof System

(OP)
I concur. Only difference here is that the walls will be site cast with wall designed by EOR. Trying to reduce cost as much as possible.

RE: EOR Responsibilities for Precast Roof System

In that event, I would say the EOR needs to provide adequate material for the connection of the precast tees, whether that is a continuous embed in the top of wall, or intermittent angles(which notoriously are placed incorrectly) that are designed for the out of plane and diaphragm loads. The precast designer should still be made aware of the required loading through his connection and he should design his embed plates accordingly.

RE: EOR Responsibilities for Precast Roof System

(OP)
That's what i was thinking and it seems like overkill but a continuous embed could prevent coordination issues in the field.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources