BadgerPE
Structural
- Jan 27, 2010
- 500
I am working on a preliminary CIP 2-way slab that has large spans of ~ 40' in areas. My superimposed loading is 50 psf dead and 100 psf live (public area) and preliminary slab thickness of 18" is being used (225psf). If I proportion the slab so that the limits of ACI 9.5(c) (318-11) are met, do I need to analyze the slab for creep as well? Per R9.5.1 "For nonprestressed two-way construction, minimum thickness as required by 9.5.3.1, 9.5.3.2, and 9.5.3.3 will satisfy the requirements of the Code". I am unsure if this includes long term deflections or not.